What’s being done to improve Kanata South?

Bridgestone and Eagleson Intersection  Improvements (2027-2028)


• Design and construction of a signalized 
intersection at Eagleson Rd and Bridgestone Dr 
with protected southbound left turn movements


Rehabilitation of the Palladium Bridge (2026)


• 0.8km W of Terry Fox Dr
• Part of a larger project renewing four sites

Hazeldean Road - Watermain repairs (2026)


New PXO Crossings (2026)


• Castlefrank Rd and Sheldrake Dr N intersection
• Rickey Place, btwn McKitrick Dr and Mc Elroy Dr


Sidewalks & pathways:


• Pathway renewal: Beaufort Park from Beaufort Dr to Katimavik Rd
New sidewalk links: Chimo Drive from Anik Way to Katimavik Rd 
• Includes missing links from 2018 project
• Includes short segment on Anik Way from Chimo Dr to Kakulu Rd


Facilities and Water Facilities Branch Highlights

Facility Branch


Tony Graham Recreation Complex projects:
• Renovation and Expansion project (2026)
• Renovation and addition to the complex including 
new multipurpose rooms, meetings rooms, 
stairwell, updated lobby and accessible service 
counter. 
Boiler replacement (2027)
• Replacing two natural gas boilers


Eva James – Roof replacement (2026)
Laura Dubois Park – Pathway renewal (2026)
Jack Charron Arena – Rink slab refrigeration (2026)

Sidewalk renewal:


• Pathway Link – Laurie Court to Sheldrake Drive
• Pathway Link – Laurie Court to Castlefrank Road
• Pathway Link – Laurie Court to Binscarth Crescent

Resurfacing


• Carbrooke St (Abbeyhill Dr to Hazeldean Rd)
• Equestrian Dr (Pommel Cr to Pommel Cr)
• Hazeldean Rd (Edgewater St to Kincardine Dr)

Water Facilities Branch


Hazeldean Wastewater Pump Station -
Manual Screen Replacement (2027-2028)


• Original equipment that requires lifecycle 
replacement
• To be replaced with a new, multi-rake 
automatic screen